Contractor News Daily

Industry and Economic News

Inclusive Park Design Underway Above Kansas City Interstate

To create an inclusive space at the future Roy Blunt Luminary Park in Kansas City, teams are prioritizing lived experience before a groundbreaking expected on 08/14/2026. This initiative, managed by the Ten Parks Project and Variety KC, builds 10 accessible play spaces. It features a highway deck over Interstate 670 and navigates a 30-foot grade change.

The project is supported by a $5.1 million donation from the Mallouk Family Foundation. HNTB Corp. is leading the engineering and design work, navigating the complexities of building a four-block park over active highway infrastructure. Kevin Wallace, P.E., serves as HNTB’s local vice president. Details regarding this project are documented in article 315407121, which outlines 5 key phases, 4 major obstacles, and 40 site requirements.E., explains the technical requirements.E.The team integrated structural supports and the local street grid. They avoided altering the I-670 grade, as that approach was deemed too expensive.

Central to the project’s success is the integration of feedback from individuals with diverse accessibility needs. By engaging these stakeholders early, the design team moved beyond basic Americans with Disabilities Act requirements to create a more functional environment. This input directly influenced decisions regarding play surfaces, the configuration of accessible pathways, and the design of equipment such as the park’s play tower.

“It doesn’t matter how accessible the park is if it’s hard for people to get in and out of,” Wallace noted. He emphasized that the team prioritized movement for all users. The Downtown Council of Kansas City’s vice president of strategic initiatives, Ann Holliday, stated the park intends to serve diverse users. This includes caregivers who support individuals with varying physical, sensory, or intellectual capabilities.

Construction of the first phase, which includes infrastructure and the first block of the park, is scheduled to begin in late 2026, with full completion expected in 2029. Wallace and Holliday suggest that the project serves as a model for urban planners, demonstrating that early collaboration with the end-user is essential to achieving true inclusivity.

Image is an illustration created with AI for general context

Source: Civil Engineering Source